Chuitna Coal Prospect

The Chuitna coal prospect is a proposal by PacRim Coal to build a large strip mine on the western side of Cook Inlet, near the Chuitna River and the communities of Tyonek and Beluga. If built, the project is expected to employ around 350 people, and provide over 350 million dollars in tax revenue to the state of Alaska and the Kenai Peninsula Borough over 25 years. The proposal is opposed by many local residents and environmental groups - who are concerned about the project's local impact on fish, wildlife, and human health, and about the global impact of increased coal use. The proposal is in an advanced permitting stage, but PacRim has yet to submit a final Supplemental Environmental Impact Statement ( SEIS ) or permit applications.

Project Area

The Chuitna Coal mine would cover about 8 square miles of undeveloped land (5,050 acres) - a landscape of rolling hills, currently covered in a mix of birch forest and low wetlands with spindly black spruce. The southwestern edge of the mine area is less than two miles from the Chuitna River (also known as the Chuit), one of the major salmon rivers of Cook Inlet. There is currently no road access to the area. If the mine is built, access would be via an air strip and a road from the mine to a port on Cook Inlet.

The land at the proposal site is owned by a number of different parties. The lease itself is on Alaska Mental Health Trust land, most of the proposed coal conveyor corridor would run through Tyonek Native Corporation Land with possibly a portion passing through Cook Inlet Regional Corporation land.  The Kenai Peninsula Borough owns the proposed port site at Ladd Landing. In total, PacRim leases cover about 30 square miles in the area (20,571 acres) and include two other potential mine sites beyond the current Chuitna proposal.

Coal Potential

PacRim estimates coal reserves at Chuitna to be about 300 million metric tons, and expects production of up to 12 million metric tons (MT)/year, over a 25 year mine life. This rate of production would make Chuitna the fourteenth largest coal mine in the country, and the largest coal strip mine in Alaska history. Usibelli mine, the largest coal mine in Alaska and the only one that is currently active, produced 1.8 million metric tons of coal in 2009, and has estimated its reserves at 700 million metric tons. The coal at both Usibelli and the proposed Chuitna mine is low-grade subbituminous coal that is low in sulfur, like much of Alaska's coal. Although it has less energy per ton than higher-grade coal, the low sulfur makes it desirable for power plants looking to reduce their sulfur dioxide (acid-rain producing) emissions.

Ground Truth at the Chuitna Prospect

READ ARTICLE

...Ten miles from Beluga, we switchbacked on our skinless skis to the top of a small and rounded hill, covered with twisted birch. All around us similar hills popped up from a rumpled landscape of frozen wetlands, meadows, and ponds. It could all become a strip mine....

...Only a few small clues hinted at this land's potential future: orange survey stakes, a weather station, the landing tracks of a helicopter surrounded by snowshoe prints from biologists checking a fish-trap, stray bits of bright pink flagging tape. It was hard to imagine what it might become....

The proposal calls for a surface (open pit) mine, which would involve dewatering the area, plowing up the vegetation, and removing the topsoil and rock layers that cover the coal. Therefore all original ecosystems, streams, and lakes within that 8 square miles would be destroyed, including salmon spawning habitat in several tributaries of the Chuitna River. One salmon spawning stream runs for approximately 5 miles through the middle of the proposed mine pit, while about 6 more miles of spawning habitat lie on the pit edges. To date, no permit allowing mining directly through a salmon stream has ever been issued by the Alaska Department of Natural Resources. Such a permit would be precedent-setting.

Alaska currently obtains only a small fraction (less than 10%) of its energy from coal, using less than a million metric tons of coal per year. All of this coal is supplied by the Usibelli coal mine, which also exports nearly half of the coal it produces, mainly to Asian markets. Therefore, if no new coal-burning facilities are built in state, Chuitna coal would also be exported. However, if proposals such as the Beluga coal-to-liquids plant are developed, in-state demand for coal could consume nearly all the coal supplied by Usibelli and Chuitna.

Project Infrastructure

In addition to the mine pit, the Chuitna Mine would include an airstrip, worker housing facilities, and coal crushing facilities. From the mine, the coal would run along a 12 mile long conveyor belt to a storage facility at Ladd Landing on the shore of Cook Inlet. The storage facility could hold up to 500,000 tons of coal. From there, it would be loaded onto ships from a proposed 2 mile long dock protruding into the inlet.

Potential Environmental Impacts

Local Impacts

In addition to the destruction of the ecosystems immediately within the 8 square mile mining area and supporting facilities, there is the potential for impacts to the surrounding areas. According to PacRim's permit applications the Chuitna Mine would discharge an average of over 7 million gallons of mine runoff per day into several tributaries of the Chuitna River. This waste water will contain a number of pollutants, including organic carbon, assorted suspended solids, ammonia, nitrates, oil and grease, and metals including aluminum, iron, and manganese.

In an effort to keep pollutants and sediment out of downstream waters, mine runoff will be routed through settling ponds. Water warmed in these ponds could reach temperatures too high to support salmon in downstream waterways. Additional impacts to salmon in the Chuitna and its tributaries could come from the large changes to the hydrological balance of the river, and from any escaped pollutants.

The Chuitna is an important salmon river in the region. In 2009, the Chuitna River was the only river on the west side of Cook Inlet open to king salmon fishing, due to low returns elsewhere. Based on the threat of the proposed mine, American Rivers placed the Chuitna on its most endangered rivers list in 2007.

Coal dust could be blown across the landscape from the 12 mile long coal conveyor belt, and from the coal storage facility at Ladd Landing. In the 1990 EIS for Chuitna, it was estimated that over 200 tons of dust would blow from the storage facility each year. Under the current plan, the conveyor belt would only be covered on the top and along one side (additionally covered on the bottom over stream crossings), and the coal storage stockyard would contain hundreds of thousands of tons of uncovered coal.  There have been numerous problems with this method of coal storage at the far-smaller coal stockyard in Seward.  This dust could cause health problems for local human residents, as well as wildlife. Additionally, the structures and traffic at the landing facility could impact the endangered beluga whales, migrating salmon, or other marine life in the inlet.

Coal mines are required to reclaim the land after mining, which generally includes regrading to approximate the original surface contour, and establishing plant cover. Ecosystem standards such as salmon habitat and wetland characteristics are not necessarily included, so the post-mining land may not have the same habitat values as the current land. Based on this, a group of Chuitna opponents applied to have the land designated as "Unsuitable Lands" for mining by the Alaska Department of Natural Resources. The application was denied.

Burning coal creates a number of toxic byproducts, including solid waste such as fly ash, and atmospheric pollutants such as nitrogen oxides and mercury. The coal from Chuitna will create additional pollution that may impact waterways, wildlife, or human health wherever it is burned.

Global Impacts

Wherever the coal from Chuitna is used, emissions from coal burning will be released into the atmosphere. A number of these pollutants have a global reach, including mercury and the carbon dioxide ( CO 2 ) emissions responsible for global warming.

Potential Economic Impacts

PacRim estimates that mine construction would require 300 workers, and around 350 would be employed to operate the mine. It also estimates that over $350 million in royalties could be paid to the state of Alaska over the estimated 25 year life of the mine.

In addition to the jobs and tax revenue, the economic impact of development at Chuitna includes its costs to other industries, and costs that are incurred through taxes and health care expenses. The sum of these costs and benefits is the project's "true cost."

Some commercial fishermen who operate set-net fisheries in the area of the proposed landing and dock would be directly displaced by the development. The loss of aesthetic quality and possible pollution in the area has the potential to cause job loss for other commercial fishermen and tourism operators in the immediate area and in Cook Inlet as a whole. All mines are required to post a bond for cleanup of a mine site in case of environmental damages that occur after the mine is abandoned, or when a company is bankrupt. If these funds prove inadequate, taxpayers pay the expense (such as through the Superfund cleanup program). Taxpayers also pay the economic costs associated with many of the environmental and health impacts.

History

Interest in exploiting the resources in the Beluga Coal Fields has waxed and waned over the decades since the late 1960s, with the lease passing through a succession of corporate hands. A previous project design was evaluated in an Environmental Impact Statement (EIS) and permitted by most of the applicable state and federal regulatory programs in the early 1990s, but was abandoned due to a fall in coal prices  In 2006, PacRim Coal submitted a new permit application to the EPA for water discharges from the proposed mine. The EPA required PacRim to submit a Supplemental EIS for the Chuitna project. Scoping for the SEIS was completed in August 2006, but the final SEIS has not yet been produced, and the complete set of permit applications has not been filed.

Current Status

In March 2010, Tyonek Native Corporation granted access easements (1.6 megs) across their lands to PacRim.  As of Summer 2010, PacRim has completed a number of the baseline environmental studies required by permitting agencies and was in the process of preparing the SEIS and information required by the Alaska Surface Mining Control and Reclamation Act (ASMCRA).


Creative Commons Attribution Non-Commercial

Attribution and Copyright info

By Erin McKittrickDavid CoilBretwood HigmanGround Truth Trekking

Content on this page is available under a Creative Commons Attribution Non-Commercial license. For commercial uses please contact us.

Related Pages

Tags